Customer site preparation
requirements prior to installation should include:
Area to support cabins of approximately 10 sq
meters each.
Area to support IOS station 8 by 6 meters minimum
Raised computer room floor
Uninterruptable power source 60 KVA 3
phase for 30 minutes with power conditioning to eliminate spikes,
dips and surges. (SII can supply this optionally if
requested.)
Emergency diesel generator with auto switch if power
fails.
Main power junction into computer room 75 KVA 3
phase 50/60 Hz (SII will connect power distribution to this junction)
Raised computer room flooring in facility
Separate power, safety and signal ground grids under
computer room floor
Customer site preparation requirements prior
to installation include:
Operating temperature -- 15° to 30°
centigrade
Relative humidity -- 20% to 80% non condensing
Air conditioning sized to support power requirements
with airflow under computer room flooring
Dedicated access 24 hours/ day 7 days/week during
commissioning